ESTIMATING AND COSTING
(CIVIL ENGINEERING)
Time: three Hours Max Marks: 80
ans the Part - A
ans any 3 ques. from Part - B
*****
Part – A
1. Estimate the needed volumes and give rate analysis for the subsequent
data from the provided plan (Fig: 3) by any 1 method.
 Earth work excavation in foundation
 C.C in foundation
 2nd class brick work in foundation (C.M of 1:4)
 1st class brick work in super structure
 Flooring with 1: four C:M [50 M]
Part – B
2. [3 X 10 M]
(a)What are the Principles of working out volumes and discuss them in
brief?
(b)Explain the conditions of contracts in detailed?
(c)What do you understand about the evaluation and discuss in detail
(d)Write the standard specifications for various items of building
constructions and explain?
(e)What are the points to be considered in case of "Rates of particular item
of work" and explain?