DOEACC Society 2007 Advanced Level Course In Computer Science A5-R3: STRUCTURED SYSTEM ANALYSIS

Thursday, 13 June 2013 12:35Web

X Y
3.1 A collection of those places where we keep all documentation associated with the application and project A. Application data model
3.2 A model that identifies only the most fundamental of entities B. Systems life cycle
3.3 A study phase model that includes only entities relationships, but not attributes C. GUI
3.4 The 4 stage process of creation, startup, maturity, and decline of systems D. TUFP
3.5 Automation of entire System Development process E. Enterprise data model
3.6 It can be used to track the tasks of a project when task time estimates are fairly uncertain F. Real time System
3.7 Methodology where cost of new system equals cost of old G. A repository
3.8 Airline ticketing is an example of H. Structure Chart
3.9 Module eleven technique I. PERT Chart
3.10 Hierarchical relationship ranging from modules of a system J. Context data model
K. CASE Tools
L. Breakeven analysis
M. Presentation chart
N. Check Digit

























4. Each statement beneath has blank space to fit 1 of the word(s) or phrases in the list beneath. Enter your option in the “tear-off” ans sheet attached to the ques. paper, subsequent instructions therein. (1 x 10)

A. Needs analysis B. Prototype C. Effort
D. Abundance E. BOM F. Waterfall Model
G. Data Dictionary H. Lower I. Systems Acceptance
J. Maintenance K. DDL L. Hurricane model
M. complexity N. Physical Design

4.1 A _______ establishes relationships, fields and record kinds.
4.2 A _________ is a minimodel of the proposed system.
4.3 A __________ is a comprehensive integration and collection of data about data.
4.4 The phase of the system Development associated with creation of test data is ____________.
4.5 __________ lists all the items needed in fabrication of an item.
4.6 During ___________ phase of the SDLC, users or developers may discover errors or issues that reason the entire process to begin over again.
4.7 __________ CASE tools are used to create diagrams and generate code for database tables system functionality during the design phase.
4.8 Function points are used to measure the estimated ______ of a project.
4.9 When estimating the project time schedule after the size of a project has been determined, the next step is to estimate the ______ that is needed for every task.
4.10 The __________ implies that project estimates become more right as the project’s product becomes better understood.