Visvesvaraya Technological University (VTU) 2007 B.E Electrical and Electronics Engineering 7th SEM .06/.07 COMPUTER TECHNIQUES IN POWER SYSTEM - Question Paper

Wednesday, 12 June 2013 04:05Web



| NEW SCHEME |

Seventh Semester H.E. Degree Examination, Dec.06/Jan. 07 Electrical & Electronics Computer Techniques in Power Systems Time: 3 hrs.]    [Max. Marks: 100

Note: 1. Answer any FIVE questions.    ,

2. Assume any missing data suitably.

1 a. Explain the significance of primitive network and hence get the performance equations in both impedance and admittance form.    (05 Marks)

b.    Derive an expression for obtaining the bus admittance matrix using singular transformations.    (07 Marks)

c.    Determine the bus admittance matrix using the singular transformations for the sample power system with the line da:a shown in table below.    (08 Marks)

LINE NO.

1

2

3

4

5

BUS CODE p - q

0-1

1-2

2-3

3-0

2-0

Impedance in p.u.

0.8

0.5

0.4

0.5

0.25

a.    Obtain the generalized algorithmic expression for Bus impedance matrix elements when a LINK is added to the partial network. Also discuss the special cases. (14 Marks)

b.    Explain the steps to modify the Zbl*s for removal of a line or modification of the line impedance.    (06 Marks)

3 a. What are different types of buses considered during power system load flow analysis? Explain briefly.    (05 Marks)

b. Determine the voltages at the end of first iteration using Gauss seidal method for the

(15 Marks)

system data given below. Assume the acceleration factor a = 1.6. i) LINE DATA

Bus Codes

Admittance

1-2

2 - j 8.0

1-3

1 -j 4.0

2-3

0.666-j 2.664

2-4

1 - j 4.0

3-4

2-j 8.0

ii) BUS DATA

Contd... 2 , i


BUS NO

P

Q

V

REMARK

1

-

1.06 ZO

i

SLACK .

2

0.5

0.2

1 + j 0.0

PQ

3 ;

0.4

0.3

1 + j 0.0

! PQ

4

0.3

0.1

1 + j 0.0

PQ


4    a. Solve Ihe non linear equations using Newton Raphson method for 2 iterations

Y3 - 4x-4 = 0

2y-x-2 = 0. Assume initial values x(0) = -1, y(0) = 1.    (10 Marks)

b. Explain with the help of a flow chart Newton Raphson method of load flow analysis in a power system.    (1 o Marks)

5    a. The fuel costs per hour for plants 1 and 2 are given by

Fi = 0.2 P,2 + 40 P, + 120 Rs /Hr.

F2 = 0.25 PI + 30P2 + 150 Rs'Hr.

Determine the economic operating schedule and the corresponding cost of generation if the maximum and minimum loading on each unit is 100 MW, and 25 MW. the demand is 180 MW and the transmission losses are neglected. If the load is equally shared by both units, determine the saving obtained by loading the units as per equal incremental production cost.    0 Marks)

b. What are transmission line loss coefficients? Obtain the general expression Bmn with usual notations.    (10 Marks)

a.    What is Load Frequency Control? Explain with a block diagram model of load frequency control for an isolated power system.    (10 Marks)

b.    Explain the basic concepts of TWO interconnected control areas in LFC, with relevant block diagram models and equations.    (10 Marks)

a.    With the help of a block diagram explain simplified representation of a speed governor.    (08M&:ks)

b.    With the help of a flow chart and equations explain the Transient Stability analysis using Modified Euier Met icd.    (12 Marks)

Write brief notes on any four .

a.    Representation of Tap changing of Transformers in load flow studies.

b.    Automatic voltage regulators.

c.    Runge Kutta method for Transient stability analysis.

d.    Representations of synchronous machines for Transient stability analysis.

e.    Fast Decoupled Load flow analysis.    (20 Marks)