Motilal Nehru National Institute of Technology Allahabad 2009 B.Tech Industrial and Production Engineering QUALITY ENGINEERING - Question Paper
Saturday, 26 January 2013 05:40Web
NAME OF THE SUBJECT: QUALITY ENGINEERING
Q1) ans the subsequent [marks 4*6]
a)Draw an OC curve for n=100 and c=3 ?[marks 6]
b)Draw the corresponding AOQ curve.Identify the AOQL.[marks 6]
c)Also briefly define the procedure of drawing the OC and AOQL curves[marks 6]
d)For the previous problem,if you chnage n=200 and c=6 how the shape of the curve will chnage? comment?[marks 6]
Q2) a) describe reliability [marks 5]
b)what will be the reliability of the system shown beneath the when the reliability of components are provided as ra=0.8 , rb=0.8 , rc= 0.8 and rd=0.6[marks 5]
c)if you keep all the components in series what will be the equivalent reliability?[marks 3]
Q3) ans all questions;
a)Explain why the cost of the manufacturing varies with tolerance[marks 5]
b)Explain how the optimal quality is decided in any system for quality of design [marks 5]
c)Explain quality of conformance.What is optimal quality of conformance?Explain in brief with the help of suitable diagram[marks 5]
d)Draw a bath tub curve used in the situation of reliability,with labeling[marks 5]
Q4)answer all
a)Ten samples of parts were taken from a production line for 100% inspection,each sample containing 300 parts.The total number of defectives was 350.Compute the upper and lower control limits.What kind of chart you may draw[marks 4]
b)Ten castings were inspected in order to locate defects in them.After inspection total 37 defects were obtained.compute improper limits[marks 4]
Q5)answer any four
a)Double sampling plan[marks 5]
b)OC curve for variable[marks 5]
c)Use of P chart[marks 5]
d)Costs of quality[marks 5]
e)Producers risk and Consumers risk[marks 5]
Earning: Approval pending. |