How To Exam?

a knowledge trading engine...


Veer Narmad South Gujarat University 2010-3rd Sem B.E Weaving - 1 - 2 ( ) ( T.T ) - Question Paper

Friday, 26 April 2013 05:45Web



RN-8147

Time : 3 Hours]

B. E. - II (Sem. Ill) (T.T.) Examination

May/June - 2010 Weaving - I

[Total Marks : 100

Instructions :

(1)


M    CnsLLnlcj.L{l [qoicu    u? snqw <h>h41.

Fillup strictly the details of signs on your answer book.

Name of the Examination :


B. E. - 2 (Sem. 3) (T.T.)


Name of the Subject:


Weaving - 1


-Subject Code No.

8

1

4

7

-Section No. (1,2,.....)


Seat No.:


Student's Signature


1&2


(2)    Answers to the two sections must be written in separate answer books.

(3)    Figures to the right indicate full marks.

(4)    Tie two sections separately.

SECTION -1

1 (a) Give the sequence of yarn preparation process.    3

(b)    Draw a schematic diagram of winding process.    3

(c)    Enlist the objects of winding.    2

(d)    For Filament winding on precision winders the    1 tension recommended is _ gpd.

(e)    In case of fixed blade type of slub catcher, the    1

normal clearance between the blades is about _

times the yarn diameter for combed yarns.

(f)    With the help of block diagram explain photo    5 electric clearer.

(g)    Explain Cam Traverse.    5

(a)    (i) Which are the two main purposes of    10

introducing knots in textile?

(ii)    Enlist the requirements a knot should satisfy for efficient usage in textile industry.

(iii)    Discuss the disadvantage of knots.

(b)    With a neat sketch explain the principle of    5 pneumatic splicing.

OR

(a)    Discuss in detail basic components of a modern    10 winder.

(b)    Give the classification of yarn faults.    5

Write short notes on : (any three)    15

(i)    Package factors

(ii)    Random winding

(iii)    Causes and remedial measures - stitches

(iv)    Advantages of Rewound Weft.

SECTION - II

(a)    Fill in the blanks (1-6) :    8

(i)    Picking tappet consists of three parts viz _,

_ and _.

(ii)    Maximum numbers of heald shafts controlled by dobby shedding are _.

(iii)    _ mechanism delivers the warp to the

weaving area.

(iv)    To stop the loom instantly_mechanism is

provided on the loom.

(v)    In air jet loom weft carrying media is _.

(vi)    Velocity of the slay is higher during the backward movement. State true or false.

(vii)    What is early shedding?    2

(b)    Explain in detail cone under pick mechanism with 10 neat sketch.

5 (a) Explain in detail passage of material through plain 7 power loom.

(b)    Explain in detail with neat sketch beat up    5 mechanism.

(c)    Explain loom timing diagram.    3

OR

5    (a) Explain in detail negative let off mechanism with 7

neat sketch.

(c)    Give classification of looms and explain it.    3

6    Write short notes on : (any three)    15

(a)    F abric defects

(b)    Side weft fork motion

(c)    Warp stop motion

(d)    Different parts of loom.

RN-8147]    3    [ 100 ]







Attachment:

( 0 Votes )

Add comment


Security code
Refresh

Earning:   Approval pending.
You are here: PAPER Veer Narmad South Gujarat University 2010-3rd Sem B.E Weaving - 1 - 2 ( ) ( T.T ) - Question Paper