Veer Narmad South Gujarat University 2010-2nd Sem B.Arch Architecture Rm-6077 Surveying & Levelling ( New ) - 1 ( ) - Question Paper
B. Arch. I (Sem. II) Examination May/June - 2010 Surveying & Levelling
(New Course)
Time : 2 Hours]
[Total Marks : 50
Seat No.:
Instructions :
M CnsLLnlcj.L{l [qoicu <h>h41.
Fillup strictly the details of signs on your answer book.
Name of the Examination :
B. Arch. 1 (Sem. 2)
Name of the Subject:
Surveying & Levelling (New)
-Section No. (1,2,.....): Nil
Student's Signature
-Subject Code No.:
(2) Assume suitable data and specifically mention it.
(3) Figures to the right indicate full marks.
(4) Use of Nonprogrammable scientific calculator is permitted.
Q.l
(a) Explain following Terms (Any four):
Well conditioned Triangle, Levelling, base line, BB, offset, Traverse
(b) What is ranging? Explain the process of ranging.
04
04
Attempt Any two
Q-2
10
(a) Tabulate & Calculate RL of all the stations if following readings are taken with a 3 m leveling staff. Instrument is shifted after 3rd & 5th reading. Use any method for calculation of RL. Benchmark was taken on a 1st station having 100 m RL.
0.55, 1.25, 2.565, 3, 1.25, 1.36, 0.45, 0.55,0.8
(b) The bearings of sides of triangle AB , BC & CA are 60, 130, & 270 respectively. Compute the internal angles of Triangle.
(c) Following readings are taken with a magnetic compass. It has been observed that few stations are suspected for local attraction. Find out such stations & calculate correct bearings with check.
Line |
FB |
BB |
AB |
60 30 |
240 30 |
BC |
99 15 |
278 0 |
CD |
38 45 |
22130 |
DE |
321 15 |
139 45 |
Offset (m) |
2 |
3 |
4 |
5 |
3 |
5 |
1 |
Chainedge (m) |
5 |
10 |
15 |
20 |
25 |
30 |
35 |
(b) Explain Instruments used in Plane table surveying , its use & any one method of Orientation 06 Q-4 (a) explain following terms : FS, True Meridian, Magnetic Declination, CP, 5
(b) Explain types of leveling Staff & its use. 5
Q-5 Write short notes on following ( Any Three) 12
1. Use of Contour map
2. GIS
3. Profile levelling
4. instruments used in chain surveying
5. Total station
6. Chaining
RM-6077] 2 [ 100 ]
Attachment: |
Earning: Approval pending. |