Anna University Chennai 2009-8th Sem B.Tech Information Technology B.E/,/E Computer Science and Engineering CS 045- SOFTWARE TESTING - exam paper

Saturday, 02 March 2013 05:35Web

B.E/B.Tech.DEGREE EXAMINATION,MAY/JUNE 2006.

Eighth Semester

Computer Science and Engineering

CS 045- SOFTWARE TESTING

Time: 3 hours Maximum: 100 marks

ans ALL ques.

PART A- (10*2= 20 marks)

1. List out the people who are associated with testing.

2. elaborate test factors? Name any 5 of them.

3. List out the deliverables of requirement phase, which are considered for
testing.

4. elaborate the test tools recommended for the design phase testing?

5. What is fail-safe method?

6. Identify the elements to be tested in maintenance phase.

7. How do you categorize the parametric models used in cost estimation?

8. What is the function of a moderator in inspecting test plans?

9. Which method is used for testing prototypes? Why?

10. How do structural testing methods differ from functional testing methods?

PART B- (5*16= 80 marks)

11. (i) List out any eight common testing tools and explain their use in testing. (8)

(ii) Differentiate dynamic and static testing methods. (2)

(iii) explain any 2 kinds of reports produced to visualize the test outcomes. (6)

12. (a) (i) discuss the verification activities in traditional software
development life cycle. (10)

(ii) Distinguish ranging from verification and validation. (6)

Or

(b) (i) Using testing strategy and tactics, state how a testing methodology
can be worked out. discuss. (10)

(ii) State the different testing methodologies. (6)

(13. (a) explain in detail about how to use the volume-test test tool. (16)

Or

(b) discuss the test file process of test data test tool. (16)

14. (a) discuss in detail the steps involved in testing the change installation
process. (16)

Or

(b) elaborate the parameters to be monitored for the system acceptance?
discuss how it could be done. (16)

15. (a) discuss the inspection procedure for the test plan execution. (16)

Or

(b) explain how to test the progress of the software system during
maintenance? (16)