2x10

1. Answer the following questions :


(a)    What percentage of total water available in the globe can be utilized as drinking water.

(b)    Mention 4 adverse effects of water resources project in the environment.

(c)    How the height of dam is fixed from the known value of required volume of reservoir ?

(d)    What is irrigation scheduling ?

(e)    Mention two examples where linear programming in used in water resources project planning.

(f)    In which situation Dynamic programming can be applied in water resourses project planning ?

(g)    What is the impact of water resources project on river regime ?

(h)    Mention two advantages and two disadvantages of inter-basin transfer.

(i)    What is the role of benefit cost ratio for evaluation of water resources projects ?


(j) What is conjunctive use in water resources project ?

2.    Quantified hydrological cycle in essential for making the planning of water resources for a region. Show an authenticated quantified hydrological cycle.    10

3.    The following table gives the details about the average seasonal discharges of a river for the duration of 1963-1971. Determine the storage capacity required to maintain a flow of 475 cumecs throughout the year.    10

Year

Season

Winter

Summer

June-September

Oct-March

April-May

(cumecs)

(cumecs)

(cumecs)

1971-71

2000

150

120

71-72

1200

350

65

72-73

1400

400

100

73-74

3600

200

80

74-75

3000

150

120

75-76

700

210

50

76-77

800

320

80

77-78

2400

120

120

4.    (a) Why it is felt the interbasin transfer is

necessary in Indian context ? Discuss the difficulties to implement it.    5

(b) Considering the peak and non-peak hour power requirement, discuss the way of operation of hydropower and other power system.    5

5.    (a) There are two drinking water project

alternatives. In alternative-1, 6 corers

rupees will be spend in first year and 1

crore rupee will be obtained as water tax

for 10 years of life of the project. In

alternative-2, 7 crores rupees will be

spend on construction in first year and

1 crore rupee will be spend annually on

maintenance. Because of better mainte-PECE 8409    4    Contd

nance, this project will give return of

2 crores annually for 2 years of life of the project. Which alternative in better considering only the economic criterion. The interest rate may be assumed constant @6%. 10

6.    Explain the operation of water resources project for

(a)    conservative purpose

(b)    Non conservative purpose.    10

7.    What is effect of sedimentation of the life of the project ? Explain various short term and long term precautions for increasing the life against sedimentation at various stages of project.    10

(a)    Rule curve

(b)    Conjective use of surface and ground water

(c)    Pre-release

(d)    Riperian right.

PECE 8409    6    -C







Attachment:

( 0 Votes )

Add comment


Security code
Refresh

Earning:   Approval pending.
You are here: PAPER Biju Patnaik University of Technology 2008-8th Sem B.Tech Water Resources Management - Question Paper