Bharathiar University 2007-5th Sem B.E Civil Engineering civil i - Question Paper
MODEL QUESTION PAPER-I
BE DEGREE IV SEMESTER CIVIL ENGINEERING
SUBJECT: CV -46 BUILDING PLANNNING AND DRAWING Time: 4 Hours Maximum marks: 100
NOTE: 1. Question No.1 from section - I is compulsory and answer any two Questions from section-II
2. Assume any suitable data in case if not provided
SECTION -I
Q .No. 1 Draw the plan, elevation, and sectional elevation for the line diagram of the building shown in figure No. 1 and also write the schedule of openings.
(i) Plan of the building ------ 25 marks
(ii) Elevation ------ 15 marks
(iii) Section along AA ------ 15 marks
(iv) Schedule of opening ----- 05 marks
SECTION -II
Q .No. 1 a. Draw to a suitable scale, the section and elevation of a double shutter partly panelled and glazed door? (10 marks)
b. Draw to a suitable scale plan and sectional elevation of a staircase for an office building with the following data:
(i) Staircase room 6000mm x 4500mm
(ii) Height between floors 3750mm
(iii) Thickness of a floor slab 150mm
(10 marks)
Q .No. 2 .Prepare a bubble diagram (connectivity diagram) and develop a line diagram for
canteen building of a college with student strength of 2000 and requirements for the building are:
1.Dinning area for boys and girls separately
2.Dining area for staff
3.Kitchen
4.Stores for kitchen
5.Utilities attached to kitchen (20 marks)
Q .No. 3 .Prepare a bubble diagram (connectivity diagram) and develop a line diagram with suitable scale for P.W.D Sub- divisional office building .The requirements for the building are:
1.Entrance hall - 25m2
2
2.Adminstrative office -60m
3.Assistant Engineer office - 20m
4.Technical Assistant room - 40m2
5.Draughtsmans room -- 40m
6.Blueprint and record room - 30m 7.Store - 20m2
8.Sanitary units of Standard sizes
Q .No. 4 The line diagram of a residential building is shown in fig.no.2 . Prepare water supply and sanitary layout plans with suitable notation. (20 marks)
VISVESVARAYA TECHNOLOGICAL UNIVERSITY, BELGAUM
MODEL QUESTION PAPER-II
B.E DEGREE IV SEMESTER CIVIL ENGINEERING
SUBJECT: CV -46 BUILDING PLANNNING AND DRAWING Time: 4 Hours Maximum marks: 100
NOTE: 1. Question No.1 from section - I is compulsory and answer any two Questions from section-II
2. Assume any suitable data in case if not provided
SECTION -I
Q .No. 1 The line diagram of the plan is as shown in fig no.1 .
Prepare to suitable scale the following working drawings
1.Plan --------------- 25 marks
2.Elevation --------------- 15 marks
3.Sectional elevation ------ 15 marks
4.Schedule of openings 05 marks
Specifications The foundation and basement are of SS masonry in CM 1:6 and pointed with CM 1:4 .The foundation is 60cms wide and 90cms deep footing. The basement is 45 cms height and 45cms wide. The superstructure is brick masonry wall with CM 1:6. Provide suitable lintels and Chajja where ever necessary. The roof is RCC 10cms thick slab with clear headroom of 300cms.
SECTION -II
Q .No. 1 a. Draw a section and plan of a RCC Doglegged stair for a public building. Floor to floor height is 360cms.Width of stairs is1.5m.Rise and tread are 15cms and 30cms respectively (10 marks)
b. Prepare a working drawing for an isolated footing for a column of size
230mmx300m reinforced with 8nos of 12mm diameter HYSD bars together with 8mm dia HYSD bars in stirrups @200mmc/c.Footing size is 1.1m x1.4m with thickness of footing slab = 400mm. The mat compromises of 10mmdia HYSD bars @120mm c/c both ways.? (10 marks)
Q .No. 2 . Prepare a bubble diagram (connectivity diagram) and develop a line diagram for primary school building for first to seventh standard with student strength of 280 and requirements for the building are:
1.Classrooms for 40 students each
2.Headmasterroom 3.Office room 4.Sports room
5.Teachers room
6.Library
7. Toilets to be provided separately for boys and girls (20marks)
Prepare a bubble diagram (connectivity diagram) and develop a line diagram for Taluka headquarters building with the following requirements:
1.Managers room
2.Public waiting hall 3.Office room
4.Record room 5.Store room
6.Meeting hall
7.Recreation/Tiffin room
8.Sanitary units (20marks)
Sketch sanitary and electrical layout details for a residential building as shown with line diagram in figure no.2. (20marks)